Against the backdrop of high-proportion renewable energy grid integration, modeling accuracy for substations incorporating wind and solar power is critical. Traditional modeling methods rely on theoretical parameters and lack sufficient accuracy. This study uses the 154 kV/23 kV Yeonggwang Substation in Jeollanam-do, South Korea (connected to three wind farms and three solar power plants, with 35 Micro-Phasor Measurement Unit (μPMU) measurement points deployed) as a case study. It investigates three-phase detailed modeling using Power System Computer Aided Design (PSCAD) and μPMU data-driven calibration. Based on substation topology and equipment parameters, a simulation model encompassing main transformers, transmission lines, renewable energy units, and loads was established. A hierarchical calibration system of “data preprocessing—parameter identification—iterative correction” was constructed, employing an iterative optimization strategy of “main grid layer—renewable energy layer—load layer.” A multi-objective optimization function centered on voltage, current, and power was developed. Verification results show that after calibration, the mean relative error rates (MRE) for voltage, current, active power and reactive power are 2.46%, 2.57%, 2.52% and 3.96% respectively, with mean error reduction rates (MERRs) of 80%, 82.75%, 81.33%, and 74.94% compared to pre-calibration values. The uniqueness of the calibration method proposed in this study lies in its use of actual μPMU measurement data to drive PSCAD model parameter calibration, achieving precise matching with the actual characteristics of the substation. This provides a reference method for modeling and digital twin construction of similar substations, demonstrating significant engineering application value.