Search for a command to run...
The main objective of this project is to gain knowledge on different phases in the construction of buildings such as planning of projects, analysis, and design of various structural members, drawings, etc., A Commercial building of G + 1 has been selected for this project and the complete planning, analysis and design works have been done. And also provides a pleasant ambiance& environment to the people. The proposed commercial building is a framed structure. The load calculations have been done as per IS 875-1987(PART 1 2 & 3) and the analysis of the frame has been done using the STAAD pro software package. The limit state method of design and analysis has been followed for the components of the building. Detailed drawings showing the reinforcement details for different members are presented using the Auto CAD software. Main road, College, hospital, and departmental store will be at an affordable distance. This building will be easily accessible and noticed by people. The analysis and design of the entire structure have been completely adapted by the limit state method. The results include the various forces acting on various members as well as various schedules for various members. Also, we got the concrete take-off as well as the weight of the various reinforcement bars. For designing the framed structure, we followed the limit state method of design and referred to IS 456-2000 and IS 875 (parts I, II & III). Size of the layout: 8000 Sq.ft. Building area:4800 Sq.ft.
Published in: International Journal of Creative and Open Research in Engineering and Management
Volume 02, Issue 03, pp. 1-9